After transporting goods through the container phase, it is possible to maintain the cleanliness of the goods in the box, protect the safety of the goods and reduce the damage. In order to ensure the smooth and smooth operation of the container and prevent the container from occupying the pressure, the owner of the container--the shipowner gives the container The user--the importer has a time limit. Within this time limit, the goods are not included in the box. Beyond this time, if the goods are not taken out of the box and occupy the container, then the shipowner will be paid a fixed amount every day. This is the so-called demurrage fee.
The details are as follows: At the same time as the goods are processed for customs clearance, the importer may wish to know to the shipowner which container yard the container will be returned to, and then to the yard, and the fleet of the yard will directly release the released goods to the yard. The boxes are placed inside the yard, and then the goods are selected by rail or car to the target according to demand. At the same time as the shipments, the container will still be empty, so it is better to save the two-day time than to use the rest of the fleet to pick up the box and return to the empty container to the designated yard.